Resource

STANAG 2022 Source Evaluation Card

Two grades on every claim: how reliable the source is and how credible the information is. The scale we use, and a worked example.

Prepared by Steven Sawyers MIExpE VR, Sawyers Global Solutions Limited. Open source, unclassified. Prepared with AI assistance and checked by the author. Not legal, regulatory or safety advice.

Every factual claim in an SGS or ISC Defence Intelligence product carries two grades: how reliable the source is, and how credible the specific piece of information is. The scale is the one in NATO's STANAG 2022 (often called the Admiralty Code). This card sets out the grades and shows them applied to a real, public story.

Source reliability (the source)
GradeMeaningTypical example
ACompletely reliableThe promulgating authority for a standard; a government department publishing its own decision
BUsually reliableA parliamentary research briefing; an established specialist publication
CFairly reliableA trade publication reporting a company statement
DNot usually reliableA standards aggregator presenting superseded editions as current
EUnreliableA source with a record of error or undisclosed interest
FReliability cannot be judgedA new or anonymous source
Information credibility (the claim)
GradeMeaning
1Confirmed by other independent sources
2Probably true
3Possibly true
4Doubtful
5Improbable
6Truth cannot be judged

The two grades are independent. A completely reliable source can pass on a doubtful claim (A4), and an unknown source can report something already confirmed (F1).

Worked example: the UK energetics factory programme

Three claims about the same programme, as graded in the ISC Defence Intelligence standards register of 5 August 2026:

ClaimSourceGradeWhy
The Ministry of Defence placed contracts with 22 companies, worth up to £300,000 each, to study sites for new energetics factories (29 July 2026).Ministry of Defence announcement on GOV.UKA1The department is announcing its own decision.
The UK will build at least six new energetics factories by 2030.Defence Investment Plan, 30 June 2026A2Authoritative source, but a stated intention about the future rather than a completed fact.
A £1.4 billion commitment to Stratus.House of Commons Library briefing CBP-10935, 2 July 2026B2A reliable secondary source; the figure does not appear in the plan document itself, so it cannot be confirmed from the primary.

Rules we apply

Need a source-graded dossier?